YAJU Furniture

Hotel Furniture Manufacturer & Supplier for B2B Projects

Hotel furniture purchasing connects the bed layout, comfortable seating, luggage storage, restaurant atmosphere and the practical work of housekeeping. YAJU Furniture works with B2B buyers to discuss coordinated requirements for guestrooms and shared spaces, using room schedules and design references as the starting point.

YAJU Furniture is Shanghai Yaju Furniture Co., Ltd. Panel production is based in Shanghai and upholstery production in Jiashan; other categories may involve partner facilities. The manufacturing and supply scope for each selected model is confirmed in the quotation. Individual products, materials and specifications remain subject to confirmation.

For procurement from China, send the model schedule and destination requirements together. YAJU Furniture confirms the manufacturing or partner supply route, customization scope and supporting documents for each selected item. Compare quotations against the same approved configuration.

Selected catalogue models

These references link to existing English model pages. Confirm the offered configuration and suitability for your project before ordering.

Furniture ranges for a coordinated hotel brief

Guestroom furniture

Plan beds and bedroom furniture together with bedside units, desks, wardrobes and luggage benches where required. State which items are loose furniture and which need coordination with the fit-out. Mattress compatibility, wall interfaces and service access require drawing review.

Public area and lounge furniture

Discuss sofas, lounge chairs and occasional tables around how guests wait, meet and relax. Share circulation drawings and upholstery references so proportions, table positions and cleaning access can be reviewed together. Selected sofa and sectional references can support initial discussions.

Dining furniture

Prepare restaurant, breakfast room or other dining requirements as a project brief. Identify table formats, chair styles and arrangements. A dining proposal needs its own confirmed product list and specifications; lounge items should not automatically be considered suitable for dining.

Explore the range

Beds & bedroom furniture

Sofas & sectionals

Request a project quotation

Start with the room schedule and everyday use

A useful room schedule names each room type, furniture item, quantity and drawing reference. Separate standard guestrooms, suites and shared areas where requirements differ. Include floor plans, intended furniture positions and items supplied by others. This helps a quotation reflect the actual purchasing scope rather than a collection of unrelated images.

For beds and storage, confirm overall dimensions, mattress dimensions, door opening space and relationships to sockets, lighting and skirting. For seating, explain intended use and preferred seat feel. Cleaning methods, luggage contact and daily handling should inform material discussions, while performance requirements need documented specifications for the selected product.

Confirm materials, finishes and upholstery by item

Panel substrates, decorative surfaces, veneer, solid timber details and metal components may be considered where suitable for the construction. Ask for composition and edge treatment by item instead of accepting one material description for an entire room package. Joinery, hardware and fixing details should be checked against approved drawings.

For upholstered pieces, confirm cover material, colour, seams, cushioning and cleaning guidance. Finish samples help compare timber tones, panel surfaces, exposed metal and fabrics under the intended lighting. Staining, coating, laminating and sewing are fabrication or finishing options to confirm for the chosen model.

Provide exact fire, durability or other contractual requirements and the destination before selection. Request evidence tied to the proposed material or model and check its scope.

Turn design references into a controlled specification

Customization can involve dimensions, finishes, upholstery and item combinations, subject to model review. Send drawings with revision references and identify features that must remain consistent across room types. Agree how samples, drawings and requested trial items will be reviewed before the corresponding production decision.

Include replacement parts in the purchasing conversation. Ask which hardware, legs, covers or other components can be supplied separately for the chosen construction, and how finish references will be recorded. Future availability and colour matching must be confirmed when required.

Minimum order requirements depend on model, material, finish and customization. A mixed room package still needs item-level review, especially where several finishes or upholstery selections divide quantities.

Build a quotation and packing plan around the project

Send the room schedule, drawings, quantities, finish references, destination and preferred purchasing scope. Identify the planned handover sequence as a requirement for review, without treating an unconfirmed date as a supply commitment. The quotation should clarify inclusions, sample requirements, packing and delivery responsibilities.

Agree packing for the selected models, transport route and handling conditions. Discuss protection, assembled or disassembled packing where appropriate, and labels linking cartons to room types, floors or installation zones. Confirm label contents so receiving teams can identify items without opening every carton.

Before finalizing an order, check approved quantities, drawings, finish samples and packing labels. Confirm availability and supply responsibility for each guestroom, public-area and dining item, including site assembly or installation where relevant.

Hotel furniture purchasing questions

Can one enquiry cover guestrooms and public areas?

Yes. Group requirements in one enquiry while separating room types and public areas in the schedule. Each item still needs an agreed specification and confirmed supply scope.

What should I send for a useful quotation?

Send quantities by item, room drawings, dimensions, finish or fabric references and destination. Mark missing decisions so they can be discussed before the quotation is finalized.

Can furniture match our interior design references?

Share drawings, photographs and finish samples. Options can be reviewed against selected models. An inspiration image alone does not establish an approved production specification.

How is the minimum order quantity determined?

It depends on model, materials, finish and customization. Confirm each item and finish combination in the quotation, including any proposed mixed room package.

Are certificates available for every hotel item?

Do not assume blanket certification. State the required document, then confirm whether verified evidence applies to the exact proposed model, material and intended use.

Can cartons be identified by room type or floor?

Request the label format during quotation. Agree packing and labelling for the actual products and handling route, including how room or floor references are mapped.

Prepare your hotel furniture enquiry

Share your room schedule, layout drawings and finish direction with YAJU. Include guestroom, lounge and dining requirements, highlight decisions still open, and request a quotation recording selected models and supply responsibilities.

Send hotel project requirements

YAJU company facts & sourcing contacts